AIRCRAFT MANUFACTURE AND REPAIR INDUSTRY NEWS FROM MIRAJ

Contact us for an in person meeting at one of these Aviation Industry Events:

NBAA-BACE

HAI HELI-EXPO

MRO AMERICAS

Major Operators of the DHC-8-400 turned to Miraj to solve the brush life issues that had been plaguing their APU starter generators. Looking at a number of factors including loads, duty cycle and operating conditions, Miraj designed a replacement brush using a specially formulated material and design that eliminated the problem.
Categories
Archives
M2005 22 M2005 2 M2040CC 1
Uncategorized
Miraj Corporation

DASH 8 400 Miraj Number One!

Major Operators of the DHC-8-400 turned to Miraj to solve the brush life issues that had been plaguing their APU starter generators. Looking at a number of factors including loads, duty cycle and operating conditions, Miraj designed a replacement brush using a specially formulated material and design that eliminated the problem.

Read More ยป

Our FAA PMA bearings are intended for use with: